Case Study

Astellas Institute of Regenerative Medicine

Rising to the challenge to create two sophisticated control systems: non-cGMP and a fully validated CGMP

Astellas selected Albireo Energy to retrofit an existing location in Westborough, Massachusetts over the incumbent and other national players due to our strong life sciences portfolio. To stay on schedule, two different controls teams – GMP and non-GMP – served the customer. Work also included validating a significant portion of Astellas’ HVAC systems which added an additional layer of complexity.

This improved manufacturing facility supports Astellas’ mission to accelerate regenerative medicine and cell therapy research and development. Enhancements to the production areas also allows for a more efficient supply chain by meeting the demands of commercial production.

Download Full Case Study Now.

Learn how you can optimize your building’s performance and reduce your operating expenses while enhancing occupant comfort and system reliability.

Decorative: blue abstract shapes
Hand holding a lightbulb with coins inside.

10 Mind-Blowing Energy Efficiency Actions for Data Centers

Hand with energy icons appearing from fingers

Turn Energy Usage and Building Data into Actionable Items