Albireo maintained a hands-on role with the embassy for eight years, from early design work to installation to post-completion systems monitoring. The complexity and scale of the embassy’s intricate systems were unlike any the Albireo team had previously encountered, and the amalgamation of such disparate systems led to a very complicated integration.
Download Full Case Study Now.
Learn how you can optimize your building’s performance and reduce your operating expenses while enhancing occupant comfort and system reliability.
![Decorative: blue abstract shapes](https://www.albireoenergy.com/wp-content/uploads/2021/07/abstract-shapes.png)